Lingo Construction Services

Project Goals:  Restoring the historical integrity to the original structure both internally and externally is central to the project. Once complete, the design seeks to gracefully insert new elements, such as walls, beams, and ceilings, treated as if they were “x-rayed” versions of typical construction methods. This approach exposes the internal framing and building systems through the use of clear polycarbonate panels rather than hiding all elements through typical opaque gypsum board for all to see. This approach allows one to understand how the building is put together and how it functions. The selective addition and placement of new walls stand in a harmonious contrast with the existing structural elements, which remain. Our concept allows construction to be visible. Program Requirements: A two story entry and lobby space is filled with natural light from the south-facing storefront and skylights in the existing bowstring truss roof make the transparency of the building is evident before entering the building. A new sculptural steel stair cantilevers overhead, physically, but not visually separating the offices from the adjacent lobby space.  A high level of craftsmanship insures the exposed elements contribute to the overall understanding of the construction process. The expression of the construction process is continued outside, where the north-facing deck provides a visual understanding of “stick framing” as well as a comfortable shaded area for a place to pause.

Built
2013

Project Type

Address

123 N. W. 8th Street, Oklahoma City, Oklahoma, 73102, United States

Related links

Credits

  • Elliott + Associates Architects
  • Elliott + Associates Architects