Design of Wagon tippler, Stacker – reclaimer, Underground tunnels, Reclaim Hoppers, Crusher house, U.G.Transfer towers, Trestle foundations, MCC Rooms, DE/DS system, Roads, Storm drains, etc. The approving agency was BHEL / Desein. The Project was award to EPC contractor JMC Projects. The Project was won at a competitive price on the basis of the bid stage design done by VMS. Actual quantities remained well within the quantities forecasted at Bid stage. This greatly reduced riks of cost overrun for the EPC contractor.
Coal Handling Plant Thermal Power Plant


Project Status: Built
Completed: 2012
Project Type
Address
Related links
Credits
- Architect: VMS Engineering & Design Services (P) Ltd
- :